OUR KENNEL
All of us here at S.O.S. KENNELS have been very excited about our new addition.  We have built a 15' X 35' cinder block dog house, with Kennels attached to the outside, for our spoiled babies.  They will have AC in the summer and heat during the winter.  We will post pictures of the dog house as it is coming along so check back from time to time.
Our "OLD" Kennel.
First came removal of the bank and the forming of a ditch for the footer. 
Then it was time for the concrete to be poured and smoothed out for the first 4 layers of cinder blocks for the footer.
The 4 layers of cinder blocks have been placed and are waiting to dry before back filling and preparing for the concrete floors to be poured.
Contact Us
HOME
The back filling is done and the rocks have been dumped in.  Once the frame is built for the concrete floors, the concrete can be poured over the rocks.
The frame was built and the concrete was poured.  Jerry is leveling the concrete and making a smooth surface.  Next, the cinder blocks will be laid to form the outside walls.
The cinder blocks have been brought in and the walls are starting to form.
This is a picture of the front of the kennel.  There will be 2 windows and barn doors.
This is a picture of the right side of the kennel.  As you can see, there are 2 doggy holes and a hole for a window.
This is a picture of the back of the kennel.  There is 7 doggy holes.  Kennels will be placed on the concrete slab.
This is the left side of the kennel.  There are 3 doggy holes on this side.  There will also be 3 kennels on this side.
This is a picture of the right, inside part of the kennel.  The 2 seperate rooms are for welping boxes.  The hole is for a window.  You can also see some of the dog boxes for the dogs.
This is a pictue of the left, inside of the kennel.  these boxes are the dog houses for the dogs.  The hole above is for a window.
The roof is already on it's way.  Jeremy is working long and hard to get this kennel up and running as the dogs are wondering what this new thing is for! 
We have been working hard at keeping this project coming along fairly quickly.  In this picture, the panels are being put in place and the dogs are being added. 
The kennels are all attached and the dogs have all been added.  The dogs just can't Thank Us enough for their new homes.  Although they continue to try by giving us many, many, many kisses.  As you can see, the roof is on the house part of the kennel and now the roof is being placed over the panels.  This is to protect the dogs from the rain, snow and sun.
   The roof on the building and on the back kennels has been completed.  Next is a small roof over the 3 side kennels.
The roof on the 3 side kennels has been completed and the building is fully operational.  Heating has been added.  Siding will be added soon. 




     Picture Coming Soon
Our "NEW" Kennel.