OUR KENNEL
All of us here at S.O.S. KENNELS have been very excited about our new addition.  We have
built a 15' X 35' cinder block dog house, with Kennels attached to the outside, for our
spoiled babies.  They will have AC in the summer and heat during the winter.  We will post
pictures of the dog house as it is coming along so check back from time to time.
Our "OLD" Kennel
First came removal of the bank and
the forming of a ditch for the footer.
Then it was time for the concrete to be poured and smoothed out for the
first 4 layers of cinder blocks for the footer.
The 4 layers of cinder blocks have
been placed and are waiting to dry
before back filling and preparing for
the concrete floors to be poured.
Contact Us
HOME
The back filling is done and the
rocks have been dumped in.  Once
the frame is built for the concrete
floors, the concrete can be poured
over the rocks.
The frame was built and the
concrete was poured.  Jerry is
leveling the concrete and making a
smooth surface.  Next, the cinder
blocks will be laid to form the
outside walls.
The cinder blocks have been brought
in and the walls are starting to form.
This is a picture of the front of the
kennel.  There will be 2 windows and
barn doors.
This is a picture of the right side of
the kennel.  As you can see, there
are 2 doggy holes and a hole for a
window.
This is a picture of the back of the kennel.  
There is 7 doggy holes.  Kennels will be
placed on the concrete slab.
This is the left side of the
kennel.  There are 3 doggy
holes on this side.  There will
also be 3 kennels on this side.
This is a picture of the right, inside
part of the kennel.  The 2 seperate
rooms are for welping boxes.  The
hole is for a window.  You can also
see some of the dog boxes for the
dogs.
This is a pictue of the left, inside of the
kennel.  these boxes are the dog houses for
the dogs.  The hole above is for a window.
The roof is already on it's way.  Jeremy is
working long and hard to get this kennel up
and running as the dogs are wondering what
this new thing is for!
We have been working hard at keeping this
project coming along fairly quickly.  In this
picture, the panels are being put in place and
the dogs are being added.
The kennels are all attached and the dogs have all been
added.  The dogs just can't Thank Us enough for their new
homes.  Although they continue to try by giving us many,
many, many kisses.  As you can see, the roof is on the
house part of the kennel and now the roof is being placed
over the panels.  This is to protect the dogs from the rain,
snow and sun.
The roof on the building and on the back kennels has
been completed.  Next is a small roof over the 3 side
kennels.
The roof on the 3 side kennels has been
completed and the building is fully operational.  
Heating has been added.  Siding will be added
soon.
Our "NEW" Kennel